Projects

Our project execution is focused on interface between project management and engineering as well as the technical and commercial risk management with vendors/contractors which ensures timely delivery of the project deliverables.

Our Project Range:

  • Crane Management
  • Design (Concept, FEED and Detailed)
  • Decommissioning and Abandonment
  • Riser Tie-Ins
  • Well/Pipeline Commissioning
  • Construction engineering
  • Inspection, Repair and Maintenance
  • Installation engineering
  • Specialist analysis and studies
  • Testing and verification

Key Projects

1Title:
Blake Manifold, Main SUT Methanol Line Repair and Jumper Replacement.

Project Description:
The project involved the isolation, barrier testing and repair of Methanol Line 1 at Blake Manifold Main SUT. As part of the same diving programme, our scope also involved the installation of Electrical Jumpers between channels A & B and re-instatement of power to Subsea Tree W3.

1


Title:
2
Osprey Field Pigging Loop Spool Replacement Project.

Project Description:
Our scope involved the barrier testing and removal of an in situ blind flange. It also includes the installation and connection of a Pigging Loop Spool within the Osprey Production Linear Block Manifold (PLBM) structure

2


3Title:
Don SW/Heather Broom SAL Recovery.

Project Description:
The project involved the deployment of clump weight to relocate surface buoy away from operation area. The scope also involved the disconnection of ground chain from the chafing chain and mooring of surface buoy assembly; and finally, the disconnection and recovery of the loading hose and upper/lower ropes.

Don_Thistle_April-2010-A1


7Title:
Breagh ‘A’ Field Development Project

Project Description:
The project involved the fabrication, installation and hook up of 20” and 3” spools. The scope also involved the deployment of concrete mattresses, to protect the newly installed spools.

7


T4itle:
Don SW/Heather Broom SAL Recovery.

Project Description:
This involves the installation of nine suction anchors and nine mooring chains for the Athena FPSO in the Athena field. The work scope also includes performing chain link cut, Mooring chain lay-down and Installation of the female Ballgrab receptacle in the mooring chain.

4


5Title:
FFFA Decommissioning Project.

Project Description:
This involves the recovery of Flowlines, Risers, Umbilicals, associated Structures, Anchoring Mechanisms, a Mid Water Arch and numerous protection mattresses from the Fife, Fergus, Flora and Angus fields which will be returned to shore for recycling and disposal.

5


8Title:
T&G/Shell Bonga Crane Management.

Project Description:
Provision of technical support, manpower and equipment for the of 10-yearly Preventive Maintenance of BONGA FPSO Cranes for Shell Nigeria Exploration & Production Company (SNEPCO).